Caltrain Electrification

It has been almost a decade since the first report on the electrification of the Caltrain line was produced. Faster trains, no diesel exhaust, very little noise, and lower operating costs were all projected with the conversion to electric trains. Why has it taken a decade to move this project forward? Click below and read the 1992 report.

Read on....

 

 

 

 
01.14.01